Wednesday 17 December 2025 17:17
Wednesday, 17 December 2025, 17:17
PHOTO api.bg
Font size
Traffic in both directions on the Danube Bridge at Ruse resumed at 16:00 local time on 17 December, the Road Infrastructure Agency (RIA) said. Works on a 320-metre section towards Romania were completed a day early. During the Christmas and New Year holidays, all vehicles can cross without restrictions.
The next phase of repairs, on the 320-metre section towards Bulgaria, is due to start on 8 January 2026. Traffic will continue to flow in both directions on the lane not under construction.
Editor: Miglena Ivanova
Posted in English by E. Radkova
This publication was created by: Elizabeth Radkova